've bought a R65LS in need of lots of TLC back in February.
I took her apart and had the frame sandblasted & painted, did the POR treatment in the fuel tank, overhauled the engine w/new rings & valve job & general cleaning / painting where the black paint had peeled off and had the transmission serviced (had a broken clip).
I've cleaned all the parts and rebuilt the carbs. Every part from front to back and top to bottom has been cleaned.
I took pics of the wiring harness and was thinking of first putting the frame back together, center stand, swing arm and front, rear wheels on. Realize I'll have to take off the swing arm after to put the transmission back in. I do have a m/c lift.
I also have a Clymer full shop manual. I want to start putting her back together again - any good strategies for getting started?
Not in a big hurry. Hoping to have her running by Spring.
Thanks,
Ken in MN