Update:
went to pick up the heads yesterday and the fella hasnt done them yet but has promised me they will be done by friday. I hope so because ive ordered a complete top-end gasket set from motorworks and im planning in reassembling the top end on sunday/monday after which i can then:
1. dismantle the rest of the rear end inc. bevel from the rear wheel and drive shaft;
2. separate the 'box from the engine as this is being part-ex with an reconditioned unit;
3. remove engine in its entirity to be prepared for bead blasting (cover all holes and stuff);
4. dismantle the front end from the frame;
5. and finally prepare the frame to be sent away, which will be after my weekend away coaxing a 50 year old 16 cyl diesel engine back into life after 15 years of silence.
And while im here, ive been looking through my pics of the resto and it suddenly dawned on me that i havent posted half the pics for this year

so ive uploaded them and added descriptions too

they can be found at the same site mentioned in my last post.
laters guys
v&p