Had the bike back for two weeks now, managed to get two shake-down rides in with a couple of issues;
poor cold starting
Fast idle/rough running
Terrible brakes (front)
Need to get used to warming the old girl up as she doesn't like being cold, very pleased with fit/finish other than clock set & h/bar assemblies (next winter project).
List of things done;
Complete nut/bolt stripdown
All black parts powdercoated
S/S fasteners used throughout
All alloy/Alu parts (including engine casings & snowflakes) vapour blasted
Engine 'zero' hour unit
Upgraded electrics, bean can and diode board gone
New bearings throughout
New s/motor
New clutch
Progressive springs/now rear shocks
New battery & tender
Carbs stripped & cleaned
Brakes stripped, overhauled, new pads/shoes, S/S lines, new M/C
All bodywork painted in original colour with hand painted coach lines by Dream works
Seat unit refurb and re-cover
Avon R/Runner tyres
H/Grips
Hope you agree, she looks good, just need to get her running well...