Update: She came home last night

.
List of everything done to date at the Custom Vintage shop.
1. Siebenbrock power kit. (Dynoed at 51 HP.)
2. Machined heads. ( For the notorious R65 warped heads.)
3.New Siebenbrock Peanut valve covers. ( My bike, my choice.)
4. Secondary air delete.
5. Rebuilt carburators. ( Current 142 main jets, running rich so maybe putting 140's in in the future.)
6. New fuel lines.
7. New metal shifter roller, springs and cir clips.
8. New rear main seal.
9. New clutch kit.
10. New swingarm boot.
11. Fixed stripped final drive fill hole and installed new oversized bolt.
12. Breaking in now.