The New And Improved Unofficial R65 Forum V2
General Category => Totally Off-Topic Discussions, Rants, Tire & Oil Threads, Etc. => Topic started by: Bob_Roller on October 17, 2009, 05:30:36 PM
-
As of 1430 local today, I'm on vacation for 5 weeks !!!!
Definitely ready for it this year .
I'll start working on the '84 LS this week, getting new tires and tubes installed on Wednesday .
Then the front brake system will be re-assembled .
Took the seat in last Tuesday to get it recovered and a gel pad installed, got a call today from the seat shop, and the seat is ready for me to pick up on Monday .
Exhaust system will be removed and taken to Jet Hot, for reconditioning the black coating on the header and cross over pipes , they have a dingy gray look to them, but the mufflers are still in remarkable shape, for 91,000 miles .
One of their shops is just about 2 miles from home .
http://www.jet-hot.com/motorcycles.html
While the exhaust is off, I'll replace the timing chain, and the alternator brushes .
-
Enjoy the time off Bob! Nothing like messing around with your favorite ride(s) on the down time. And don't forget to take a nap every now and then.
-
I like to get majority of what needs to be done, in the first 7-10 days, while I'm still in 'work mode' .
After that the enthusiasm level drops off pretty fast, and chances of getting any appreciable amount of work accomplished is almost non-existent .
With the temperatures forecast to be favorable to working in the garage (low 90's F.)